
Use our tools to estimate your sewage treatment plant needs and costs.

Estimate the required treatment capacity based on occupancy and water usage.
KLD stands for Kiloliters per Day, a measure of daily water usage.
To estimate how much water and money you can save using Matrix over 5 years.
It shows estimated cost savings over 5 years based on your KLD.
Any business or facility using STP/ETP systems.
Yes, the estimates are based on real performance data from Matrix installations.
Yes, it works for any industry using STP/ETP systems.
The results are estimates based on average performance data and real use cases.

Estimate the required treatment capacity based on occupancy and water usage.
A tool to estimate the sewage treatment capacity required for any project.
Capacity = No. of people × Daily water usage × 0.8 (sewage generation factor).
Typically 135 liters/day for residential setups.
Usually 80% of total water used is considered as sewage.
Yes, adding 10–20% extra capacity helps handle peak loads.
Yes, output is in KLD (Kilo Litres per Day).
Yes, especially when evaluating if existing capacity is sufficient.

Calculate estimated costs for prefabricated STP units using standard configurations.
A tool to calculate approximate costs for prefabricated STP units.
Usually starts from 5–500 KLD.
No, civil works like foundation and shelter are typically excluded.
Yes, most tools let you select from various treatment methods.
It’s an approximation for budgeting; final quotes may vary.
Yes, detailed quote shows component-wise cost (e.g., tanks, blowers, panel).
Yes, especially useful for villas, hotels, small factories, and communities.

Assess the projected civil construction cost for a custom-built STP system.
A tool that calculates the electro-mechanical cost of an STP.
Absolutely, it's helpful for project estimates and bids.
Civil engineers, contractors, consultants, and STP system designers.
Yes, use it alongside prefab estimators for decision-making.
Share your details and our team will reach out.